# K2021–K2025: per-CPU data areas One serialized kernel registry binds accepted CPU affinities and logical indices to distinct, exclusively leased pages. The kernel supplies fresh issuer/epoch values, the real RAM interval and a live SMP barrier transport. Constructor checks cover capacity, reserved affinity bits, duplicate CPU/address mappings, alignment, checked ranges and overlap with the barrier. The first 128 bytes of each page hold sixteen little-endian words: registry, epoch, generation, affinity, logical index, physical self address, barrier address, expected update count, observed counter, observed sum, prior TPIDR_EL1, active flag and four zero reserved words. Update counts are bounded by 1024. The guest experiment will use distinct workloads of 17, 34, 51 and 68 updates. The sum is the sum of integers from 1 through the expected count. A non-cloneable publication ticket owns one pending CPU binding. Accepted binding requires an independently observed CPU receipt, genuine MPIDR and TPIDR_EL1 values, complete matching area bytes, and a previous TPIDR which does not refer to any of this registry's leased areas. A private bound token retains the generation and original register value. Pending or bound areas prevent registry closure. CPU identity, hardware self pointer, issuer, epoch, generation, counter, sum, activity and all reserved bytes are checked without partial state changes on failure. The planned four-CPU guest test will set and read TPIDR_EL1 on each CPU, update only that CPU's own area, then hold secondaries at the accepted startup barrier. The primary observes every binding before releasing the barrier. Each CPU restores its previous TPIDR before publishing a terminal acknowledgement and stopping area accesses. Only the genuine acknowledgement and restored register permit detachment. Full page erasure and release follow all detachments. Aborting an unstarted publication is unsafe: the kernel must prove the CPU never received it and cannot act later. A subsequent publication gets a new generation; old tickets cannot bind a reused area. This step does not establish per-CPU IRQ stacks, interrupt delivery, scheduling or production readiness. Guest acceptance remains pending until actual physical evidence passes all six profiles.